Discussion Topic : GeoWall 2017 Rules Claifications

Dr. Tiwari, On our initial read we have some preliminary claifications that we would like. We have found no clarification thread so far, therefore we are listing them here. 1. Under 10.B, Execution - Construction Stage, there is no mention of the time given to fabricate the wall and/or attach the reinforcement to the wall. Will this be timed seperately from loading of the backfill? 2. Under 10.c, Execution - Loading Stage, there is a reference to Figure 5. There does not appear to be a Figure 4 or Figure 5. Will a figure be added or is listed dimension of 5" from the front wall comprehensive? Thank you for your consideration, ASCE CSUN