Engineer Md._Iqbal, FIEB, MBSGE, PGDPM

Mr. Engineer Md. Mohsin Iqbal, FIEB, MBSGE, PGDPM

Connections 5
Files 1

Professional Information

Chief Construction Officer [CCO] - N. MOHAMMAD GROUP OF INDUSTRIES (Real Estate and Construction Division)

  • Civil Engineer Geotechnical Engineer

Construction

  • Deep Excavations Retaining Walls Shallow Foundations Pile Foundations Soil Structure Interaction Site Response Analysis Grouting
    Stabilization Groundwater Pumping Management Risk & Reliability Standard Penetration Testing (SPT) Settlements Underground Structures

  • MSc or Equivalent
    • Master of Civil Engineering (Geotechnical Engineering) - Bangladesh University of Engineering and Technology : 11/10/2007 - 24/03/2013
  • BSc or Equivalent
    • B.Sc. In Civil Engineering - Dhaka University of Engineering and Technology : 17/12/2003 - 23/09/2007

  • First class 5th in Position based in Merit at B.Sc. Engineering (CGPA 3.73 out of 4.0) DUET, Bangladesh, 2007

  • N. MOHAMMAD GROUP OF INDUSTRIES (Real Estate and Construction Division) : ( 01/08/2024 - Present )
    • Chief Construction Officer [CCO]

    • I am working in N. MOHAMMAD GROUP OF INDUSTRIES as Group’s Engineering Head overall responsible for all construction projects management work (Governmental & private), Real Estate, Own factory construction/developments, structural Compliance, renovation/retrofitting, new projects planning to completion with report to Managing Director. Various type of projects ongoing (High rise/low rise Building with multiple Basements, Prefabricated shed, RCC road, Bituminous road, Culvert, Drain, Retaining wall, UGWR, Land development etc) in Real-Estate, Private, Industrial and Governmental construction sector. Area of Expertise: Construction, Project Management, Tender works, Budgeting and Scheduling, ERP Software (Oracle), Auto CAD, design software Etabs.
      The country`s 1st one stop solution provider for residential/Apartment, commercial, industrial construction and materials supply, build your dream from Plan to execution/results, equipped with state-of-the-art technology, and creating aura of excellence in your life. All our efforts aim to fulfill all your needs under one roof with hassle-free service. N. MOHAMMAD GROUP OF INDUSTRIES have state of the art factory for plastic product manufacturing with modern technology and machinery, a stabilized brand in the Bangladesh. We have own production of plastic chair, table, seat, bench, bucket, cabinet, Mug, baby items, water pot, tray, hanger, rack, mora, school items, bowl, commode, water pump, uPVC pipe, PPR pipe & CPVC pipe with fittings, HDPE pipe and other Polymer items and fittings, uPVC door, Wood Plastic Composite door (WPC), PVC water tank, PVC board (6/12/18mm), Furniture manufacturing (all kinds). Our Group have Experience centre “ Build Best” having a wide range of material for home finishing, sanitary, furniture, tiles etc. at Chattogram, Dhaka. We have industrial park in Boalkhali (chattogram), Gazipur, Mirsarai economic zone (chattogram), corporate office located at Dhaka, Bangladesh.


      # Some projects are:-
      -Project 1: Skyline Tower, Basement+14 story Apartment Building (Ongoing Real Estate project) at Panchlaish R/A area, near United nation park, Chattogram (Area=150,000 Sft, Value 60 Crore), running from January, 2025 (48 Flat with swimming pool, community hall, BBQ, Gym, 52 parking and other modern facilities) having 180 nos service cast-in-situ pile etc.
      -Project 2: N. Mohammad Polymer Unit-3, Basement+6 story factory Building (Industrial project) at Boalkhali, Chattogram (Area=330,000 Sft, 250 Crore), start from January, 2024 (Processed for LEED Certification) with Utility building, Fire tank etc.

      -Project 3: N. Mohammad Polymer Unit-2, 3 story PEB factory Building (handed over Industrial project) at Boalkhali, Chattogram (Area=25,000 Sft), handover in October 2024 with ST, 2 story RCC admin building etc.

      -Project 4: LGED Saidul Haq Road, a 700 meter bituminous road (handed over Governmental project of LGED) at raozan, Chattogram (width 8 ft) with RCC shore protection by piling/brick wall and 2 nos Culvert construction, handed over in january 2025.
      -Project 5: Public Health Wash block building, a 21 number wash block building construction (ongoing Governmental project of Public Health Engineering Department) with Mat foundation/Isolated footing at Raozan, Chattogram with structural and finishing work like brick work, tiles work, sanitary and plumbing wiring, electrical wiring/switch/socket, toilet fixtures, paint work, gate fitting, door/window, grill etc with ST-Soak well and will be handed over in February 2025.
      -Project 6: Directorate General of Food, Food Ministry, 1000 MT (10,000 Sft) and 500 MT (5000 Sft) Food Godown building, a 22 Ft height building construction (ongoing Governmental project) with Pile foundation/Isolated footing at Anwara and Satkania chattogram, Sandip Chattogram with structural and finishing work like brick work, tiles work, sanitary and plumbing wiring, electrical wiring/switch/socket, toilet fixtures, paint work, gate fitting, door/window, grill etc with ancillary structures and will be handed over in June 2026.

      -Project 7: LGED Gohira Ismail Road, a 900 meter bituminous road (handed over Governmental project of LGED) at raozan, Chattogram (width 8 ft) with 1 nos Culvert construction, handed over in April 2025.

      -Project 8: LGED Kabir ahmed Road, a 1000 meter bituminous road (handed over Governmental project of LGED) at raozan, Chattogram (width 10 ft) with 1 nos Culvert construction, handed over in April 2025.

      -Project 9: LGED Modunaghat Road, a 900 meter bituminous road (ongoing Governmental project of LGED) at raozan, Chattogram (width 10 ft) with RCC shore protection by piling/brick wall construction, will be handed over in June 2025.
      -Project 10: LGED Bashkhali Fakir Shah Road, a 1500 meter bituminous road (ongoing Governmental project of LGED) at bashkali, Chattogram (width 8 ft) with RCC shore protection by piling/brick wall and 1 nos 7.3m long Culvert construction, will be handed over in June 2025.
      -Project 11: LGED Bashkhali Mvi Ashkaria Road, a 1000 meter bituminous road (ongoing Governmental project of LGED) at bashkali, Chattogram (width 10 ft) with RCC shore protection by piling/brick wall and 2 nos Culvert construction, will be handed over in July 2025.
      -Project 12: Public Health deep tubewell with structure, a 750 number deep tubewell (750-800 ft depth) with infrastructure construction (ongoing Governmental project of Public Health Engineering Department) at Raozan, Chattogram with structural and finishing work like brick work, tiles work, plumbing work etc and will be handed over in June 2025.

      Also there are 3 building under design stage in Mirsarai Economic zone, chattogram for factory construction, one 6 story factory building in Boalkali chattogram and planning ongoing to increase real estate projects, private construction projects and Governmental projects (in PWD, Road & Highway, EED, LGED, Water Development board, Navy etc).

      Web: https://www.nmohammadgroup.com
      Head Office Address: 179/A, West Sholoshahar, CDA Avenue, Muradpur, Chattogram-4212, Bangladesh.
  • P2P ENGINEERING & CONSTRUCTION LTD AND WECON Properties (Real Estate wing of P2P Family) : ( 16/04/2018 - 31/08/2024 )
    • General Manager & Head of Construction

    • Web: www.p2pfamily.com
      Head Office at 687 Mehedibag, Chattogram, Bangladesh. Corporate office at Banani, Dhaka.

      Area of Expertise: Construction, Project Management, Deep Excavation, 3 Basement construction with shore protection work and RCC retaining wall, Tender works, Budgeting and Scheduling, ERP Software use.
      # Operational Reporting: Director-Construction and Implementation, Functional Reporting: Managing Director.
      # Working as Head of Construction Department from Planning to Execution (Supervised: 55 person staff, 1000+ workers).
      # P2P Family (ISO Certified) is the country`s 1st one stop solution provider for construction and all types of materials supply.
      # Key Responsibilities: (1) Head of engineering for prepare project management plan, cost analysis, budget, work schedule, business plan, SOP, wastage control method of running 17 number construction projects (real estate Apartment, Industrial, commercial, Governmental project). (2) Working as head of project operation & management department, BOQ department, tendering department, QC team, revenue collection team and member of ManCom, CRM, business development team.

      Handed Over Project: 35 Nos (private, Real-Estate and government project). *** Running Project: 17 Nos

      # Some projects are:-
      -Project 1: Full fairface 7 story Knitting Factory Building construction (Total Area=10,50,000 SFT) at Pacific Knitex Ltd, near city gate, Chattogram (Owner: Pacific Jeans ltd) with 4 story Utility Building handed over in 14 month (November 2021), Basement+6 story ETP Building with 36 ft Deep Basement handed over in 4 month only.
      Web: https://www.p2pfamily.com/p2p_projects/pacific-knittex-limited/ )
      -Project 2: Two Basement+11 Story GPH Admin & Dormitory Building (1,45,000 SFT) at GPH Ispat Ltd, Kumira, Chattogram handed over in Feb 2020 (Civil, electrical, sanitary & plumbing, lift, fire, Genset, Sub-station and Interior works)
      Web: https://www.p2pfamily.com/p2p_projects/gph-admin-cum-dormitory-building/
      -Project 3: Pacific Casuals, Basement+9 story factory building at Chattogram EPZ (3,30,000 SFT, Owner: Pacific Jeans ltd) handed over at just 6 month 11 days (Structural), total project at 9 month at January 06, 2019.
      Web: https://www.p2pfamily.com/p2p_projects/pacific-casual-limited/
      -Project 4: 10 Story Bangladesh NAVY 3 star standard Hotel (Shopnil Shindu) Construction at Kolatoli, Coxsbazar (85000 SFT, 85 rooms) handed over in 14 month in March 2022 (Civil work, Electrical work, Sanitary & Plumbing, Road, 2 nos 13 person Lift, 250 KVA Generator & 500 KVA substatiion, Mechanical Exhaust system, Furniture supply, Landscape and Interior Decoration works). Web: https://www.shopnilshindhu.com/about
      -Project 5: 3 Story Model Mosque and Islamic cultural centre at Kawkali, Rangamati of PWD (32000 Sft, ongoing).
      -Project 6: 9 story Apartment Building of PHP Family at Basundhara D Block, Dhaka (Area=31,500 sft ongoing).
      -Project 7: Pacific Aleyaloy, 9 story Apartment Building of Pacific Jeans at Pathorghata, Chattogram (Area=28,080 sft), handed over in 2021.
      -Project 8: WECON NOOHs CAVE, 9 story Luxurious Apartment Building at south Kulshi, Chattogram (Area=20,700 Sft), handed over in August, 2022. Web: https://wecon.com.bd/property/wecon-noohs-cave/
      -Project 9: Maf Footwear is a nine story factory building with 2 story Utility building of 6 Lac SFT area having 100% Fairface work at Nasirabad I/A, Chattogram (Duration: structural=16 month, total=20 month), handed over in July 2022.
      -Project 10: 93.53 Meter long Pre-stressed (PC) Girder Bridge-09 construction at Alikadam, Bandarban of Authority Bangladesh Army, 16 Engineer Construction Brigade.
      -Project 11: WECON SHUKRANA, 2 Basement+12 Storied Apartment building construction at 20/C, plot no-1727, Panchlaish R/A, chattogram (ongoing).
      Web: https://www.youtube.com/watch?v=WmIlXBBNurk&ab_channel=ifteqarhossainakil
      https://wecon.com.bd/property/wecon-shukrana/
      -Project 12: 9 Story main Factory Building construction of Pacific Attires Ltd (Total Area=9,00,000 SFT) at Plot 9-13, CEPZ, Chattogram (Owner: Pacific Jeans ltd) with 4 story Utility Building, ETP & WTP with 32 ft Deep Basement (Ongoing).
      Web: https://www.p2pfamily.com/projects/
      -Project 13: 18 meter long RCC girder bridge in Satkania, Chattogram and BC road construction at Patiya, Chattogram of LGED
      -Project 14: GPH Warehouse PEB shed (75,000 sft) in Kumira, Sitakunda, Chattogram. & More.

Language Read Level Written Level Spoken Level
Bengali High High High
English High High Medium

Contact Information

Chattogram, Bangladesh View on map

+8801912667761

...
...
...

Group Type Members

Name
Publications
Poll

No Polls

No Polls

Files

Title Actions


Related Links

No Related Links