-Geotechnical investigation of the Bridge site.
- Verification of the Soil report; Bore hole logged, Lab test report, verification of the Bearing capacity of open foundation, Pile capacity at different depth, effective pile length, computation of Pile capacity.
- Pile capacity check if the capacity is enough for transferring the design load in each pile.
-Verification of Scour depth and scour level for fixing foundation level.
- Design of Geogrid as soil reinforced in backfill of the foundation.