Jun 2015-May 2017 a 4 lane Aguwani-Sultanganj Bridge of 3.160 Km across Ganges River, central spans: Cable Stayed and three Extradosed bridges including approaches 23.16 Km; Total cost US$ 128.21 million
Team Leader and Senior Bridge Engineer at: Studio De Miranda Associati Ingegneria Strutturale in joint venture with RODIC Consultants Pvt. Ltd-DLF Cyber City, Gurgaon, Haryana - INDIA
Design Review and Construction Supervision of 2x2 Lane of a 3,160m long Bridge with footpath across Ganges River; between Aguwani Ghat (Khagaria District) and Sultanganj (Bhagalpur District), including navigational spans of one central Cable Stayed and three Extradosed bridges; 20 km of approaches (Connecting NH31 and NH80) in the State of Bihar on EPC mode, according to FIDIC Contract Conditions.