Manuel II_Zuniega

Mr. Manuel II Onan Zuniega

Connections 11

Professional Information

Lead Civil/Structural Engineer - KBR-AMCDE

  • Civil Engineer Geotechnical Engineer

Consulting

None specified

  • BSc or Equivalent
    • BSc CIVIL ENGINEERING - Catanduanes State University : 24/06/1987 - 28/04/1992

  • KBR-AMCDE : ( 18/01/2022 - Present )
    • Lead Civil/Structural Engineer
  • SNC Lavalin Kentz Engineering : ( 03/12/2020 - 30/12/2021 )
    • Lead Civil/Structural Engineer
  • SNC Lavalin Fayez Engineering : ( 25/11/2018 - 24/11/2020 )
    • Lead Engineer - Civil/Structural

    • Assigned to Lead the team of Civil/Structural group for MPP(Maintain Potential Project) unit under GES+ Contract with Saudi Aramco. Also assigned to Lead the Structural group for the YCOT project in Yanbu to replace existing Crude Oil Samplers. This project experienced new and old types of geotechnical studies and recommendation for the new structure foundation.
  • KBR-AMCDE : ( 01/08/2010 - 30/08/2018 )
    • Lead Engineer (Civil/Structural)

    • Assigned to Lead the engineering team of Civil/Structural group for the Infrastructure Unit and Offshore Maintain Potential Program unit of Saudi Aramco. Work includes engineering and design of new and existing oil & gas facilities onshore and offshore. This work experienced collaboration between the geotechnical subcontractor and client. Job includes development of scope work for geotechnical subcontractor, review and approve subcontractor technical bid proposal and reports. Prior to structural design, evaluation of existing soil condition based on the outcome of soil investigation.
  • Mitsubishi Heavy Industries Ltd. : ( 13/07/2009 - 07/05/2010 )
    • Sr. Structural Engineer

    • Worked for the Engineering and Construction of SPOX Petrochemical Project in ExxonMobil Singapore. Worked under the structural team from engineering, procurement and construction of all structural facilities. The challenge of this project is that all the foundation except the miscellaneous are supported by piles due to its soft soil strata.
  • Mitsubishi Heavy Industries Ltd : ( 08/08/2008 - 28/06/2009 )
    • Sr. Structural Engineer

    • Worked under the EPC team of structural engineers for the construction of first methanol plant in Brunei. Duties includes review and approve of fabrication drawings of structural subcontractors. Develop and modify structural design on site based on the requirement to complete the project. The challenge of this project includes the access for heavy equipment is limited and soft. Also design of foundation requires plenty of soil improvement and piling.
  • Chiyoda Technip Joint Venture : ( 05/06/2007 - 30/06/2008 )
    • Sr. Structural Engineer

    • EPC for the expansion of RGX6 and RGX7 LNG plant in Ras Gas, Ras Laffan, Qatar. This project under ExxonMobil and Qatar Petroleum has a complex structure and foundation that needs thorough studies of geotechnical engineering. Assigned for the site modification and engineering works.

Language Read Level Written Level Spoken Level
English High High High
Tagalog Medium High High
Arabic Low Low Medium
Cebuano High High Medium

Contact Information

Alkhobar, Saudi arabia View on map

0548437790

0548437790

...
...
...

Group Type Members

Name
Publications
Poll

No Polls

No Polls

Files

Title Actions


Related Links

No Related Links