Lead and control the construction of NATM tunnels and TBM tunnelling, excavation works at shafts and chambers along with connection tunnels to ensure smooth execution of work till completion. Coordinate entire instrumentation and monitoring system, evaluate monitor results to prepare geotechnical reports.
Key Project:
Deep Tunnel Storm Water System, Dubai, UAE
Budget: € 300 M
The Deep Tunnel Storm Water System comprises of 10.4 km long TBM tunnel with 11.05m boring diameter, NATM launching tunnels, 4 shafts with depths up to 45 m, chambers and connecting NATM tunnel between shafts and chambers.