Antonio_Di LAURO

Mr. Antonio Di LAURO

Connection 1
Albums 1

Professional Information

Geologist - Di Lauro Antonio (freelance)

Geologist - Di Lauro Antonio (freelance)

  • Geologist

Other

  • Earthquake Reconnaissance Railway Geotechnics Reconnaissance of Natural Disasters Cone Penetration Testing (CPT) Standard Penetration Testing (SPT) Visualization

  • BSc or Equivalent
    • Geological Science - University of Parma : 05/11/1985 - Present

  • Professional qualification Ordine dei Geologi Emilia Romagna, 1993

  • Di Lauro Antonio (freelance) : ( 02/01/1995 - Present )
    • Geologist

    • My professional experience has developed (and is always in a continuous phase of evolution and updating) in the central-northern part of the Italian territory as well as in the Province of Parma.
      In fact, my profession leads me to deal mainly with topics strongly related to environmental issues with particular reference to the execution, management and development of Plans for the characterization of contaminated sites through the design and execution of surveys that lead to the monitoring of soil, air, gas and groundwater matrices.
      In this sector, I would like to point out in particular a work of characterization of a landfill area with the construction and monitoring of piezometers and soil analysis (work carried out as a consultant of the former Chelab environmental analysis laboratory of Resana - TV in the first instance and then of the Alfa Solution environmental analysis laboratory of Reggio Emilia).
      Still in the environmental field, there are also other similar works (e.g. removal of underground tanks and/or land management) related to the characterization of contaminated sites with the execution of characterization plans and execution of risk analyses (Legislative Decree 152/06) and preparation of remediation plans, all with the support of accredited laboratories for the execution of the analyses.
      I have been a consultant for Golder Associates since 2015 (since January 2023 it has become WSP) and I have been a consultant for ITGroup srl from 2014 to 2021 for which I carry out construction site (and documentary) activities in the management of problems related to the management of fuel sales points (AQA – groundwater sampling and more).
      In 2016, again in the name and on behalf of Golder Associates, I carried out continuous consultancy at a company that deals with Soil & Gas regarding the due diligence activity in environmental matters (examination of characterization plans and risk analysis). From 2019 to 2021 I was a consultant for the development of an order with SNAM for the survey of geological problems concerning methane pipelines.
      Also with WSP, since September 2022 I have been part of the HSEQ team of the ENI plant in Bolgiano (S. Donato M.se) to manage waste practices
      I have also been a consultant for the Ecotherm company for activities related to the management of environmental issues.
      In addition, it is worth mentioning the management of environmental issues and due diligence carried out for the purchase and sale of active and disused fuel points of sale and the management of excavated earth and rocks according to the previous and current regulations in force.
      I also deal with groundwater sampling with both traditional and "Low-Flow" methodology, soil gas and biogas sampling both from piezometer (or borehole) and with capture chamber.
      At the same time, I worked on mineral waters. In particular, my expertise concerns the planning of geological investigations for the development and obtaining of Mining Concessions for the purpose of research, exploitation and management of mineral waters from a historic source in the Parma area.
      Following this assignment, I also held the position of mining manager at the same sources.
      I have also been a consultant for Norda S.p.A. (now Acque Minerali d'Italia) for the realization of Environmental Impact Assessments referring to a spring located in the Parma area and of Subject and Incidence Assessments and Environmental Impact Assessments (EIA) on other projects on the national territory also in the geothermal field.

      In addition, my activity is also carried out through the performance of more purely geological-technical activities (although always related to environmental matters).
      In this field, as a consultant for drilling companies, I have gained experience (many years) and held the position of site technical director for the execution of geognostic and environmental surveys along various sections of the High Speed (Milan-Naples section) in particular in the Bologna-Florence section, in the Milan-Genoa and Turin-Milan sections and on the "Pontremolese" railway line near Aulla.
      I have also developed experience in spatial planning as a sole designer of mining activities and collaborated in the drafting of several Mining Activity Plans (PAEs).
      With some colleagues I am collaborating in the drafting of the General Urban Plans (PUG in accordance with current legislation) of some municipalities in the Province of Piacenza.
      At private and public institutions, I carry out geological, seismic and geotechnical reports aimed at defining the characteristics of the territory according to the development of hydrogeological problems (such as definition of building suitability of land, research of groundwater, seismic research with identification of subsoil categories and problems related to the construction of foundations of residential and industrial buildings, etc.).
      I have been a consultant on behalf of CTU (Court-appointed Technical Consultant) of the Court of Parma and as a CTP (Party's Technical Consultant).
      Starting from the 2015-2016 school year I implemented the dissemination project "The geologist goes to school" in the DD of Via Fratelli Bandiera in Parma at the Padre Lino Maupas School in classes III – IV – V of the primary school and at the comprehensive institute of Noceto (Pr). In the 2018-19 academic year, the "Verdi" comprehensive school in Corcagnano (Pr) was also included.
      The project consists of providing pupils with useful information on how to protect themselves in the event of earthquakes, floods and landslides as well as talking to them about more purely geological aspects such as "fossils and dinosaurs", "volcanoes and earthquakes" and "hydrogeological instability".
      Since the end of 2018 I have also started popular lessons at the Museum of Natural Sciences in Piacenza on the same topics.
      In particular, in the A.S. 15-16 the project had the patronage of the Regional Order of Geologists of Emilia Romagna.
      Currently, the project continues, extending to other schools and the Museum of Natural Sciences in Piacenza.
      From February 2013 to January 2017 I was a councillor of the Order of Geologists of Emilia Romagna where I was coordinator of the Environment Commission and, in conjunction with the seismic events of 2016 in central Italy, also coordinator of the Civil Protection Commission.
      From March 2018 to February 2023 he was a member of the Commission for Landscape Quality (CQAP) of the Municipality of Parma as an expert in the evaluation of VALSAT.
  • Di Lauro Antonio (freelance) : ( 01/01/1995 - Present )
    • Geologist

    • CQAP Commissions – Order Activities - Congresses
      • From 2009 to 2014 he was a member of the Commission for the Architectural Quality of the Landscape at the Municipal Administrations of Langhirano and Calestano (Province of Parma).
      • From February 2013 to January 2017 he was a councillor at the Order of Geologists of the Emilia Romagna Region, coordinator of the Environment Commissions. and the internal commission of Civil Protection.
      • April 2016 NATIONAL CONGRESS OF ITALIAN GEOLOGISTS, member of the table "Reclamation of polluted sites" – Naples 29/04/2016
      • From March 2018 to February 2023, Member of the Commission for the Architectural Quality of the Landscape at the Municipal Administration of Parma as an evaluator of VALSAT.

      Mineral waters
      • Consultant for the Court of Parma for obtaining the Mining Concession for water extraction activities at Varano de' Marchesi (Medesano – Parma) 2006-2007;
      • Consultant geologist for the Springs located in Varano dei Marchesi (Varano dei Marchesi – Medesano – Pr) for the period 2007-2008.;
      • Director of Mining Works (624/96) for the Springs in Varano dei Marchesi (Pr) in the period 2007-2008.
      • Consultant Norda and Acque Minerali d'Italia S.p.A for the implementation of various EIA and VA and Vinca studies (2013-2021) in the province of Parma and in the Abruzzo Region (Prov. L'Aquila).
      These activities took place sequentially. In the first instance, by developing all the geological and hydrogeological studies necessary to obtain the mining concession for the exploitation of groundwater according to the indications and in compliance with national and regional legislation.
      In the second instance (once the authorization to proceed was obtained) the phases of new groundwater research and relations with the bodies in charge of control (Province of Parma, Ministry of Health, Emilia-Romagna Region and Arpae, Abruzzo Region) were then managed for the necessary checks and fulfilments in terms of administrative and health and hygiene regulations.

      Mining and quarrying
      Final design as technician in charge of the following Detailed Plans and Mining Operations:
       Municipality of Fontevivo (Parma) Detailed Plan "Ce.P.I.M." (1998/2001).
      The relevant Quarry Plan has been authorised.
       Municipality of Fontevivo (Parma) Detailed Plan "S. Tiburzio" (1998/2001).
      The relevant Quarry Plan has been authorised.
       Municipality of Fontevivo (Parma): screening procedure for the "la Magrina" area (1998/2004).
      The relevant Quarry Plan has been authorised.


      ENVIRONMENTAL SECTOR
      Consulting for Golder Associates srl and from January 2023 for WSP (from January 2023):
       from 2015 to date, direct assignments both operational on site and drafting and analysis of documentary activities relating to contaminated sites;
       From 2019 to 2021 Consultant Golder Associates srl for the project "Geological revision of methane pipelines – SNAM gas network
       (Drafting of Risk Analysis etc..) with management of Environmental Quality Assessments (AQA), monitoring of groundwater and surface water and sampling of soil and soil gas at Esso and TotalErg points of sale;
       from September 2022 for the project "Coordination and verification of the activities carried out in Bolgiano – S. Donato M.se for verification of activities carried out in the field of waste management, sampling supervision, waste loading supervision, vehicle verification, FIR verification, c/s register support, verification of IV copies monitoring, verification of supply chain (authorizations and CAS) at the ENI S.p.A. plant: in Bolgiano (S.Donato M.se).
      Consultant of IT Group Italia from 2014 to 2021 with both operational tasks on site and preparation of documentary activities relating to contaminated sites (Drafting of Risk Analysis etc..) with management of Environmental Quality Assessments (AQA), monitoring of groundwater and surface water and soil gas sampling at Tamoil and TotalErg points of sale;
      Ecotherm consultant in 2019 for the management of activities related to the management of Fuel Sales Points;
      Purge and monitoring activities in piezometers for groundwater quality control with relative sampling for analysis in quarries and landfills (performed both with traditional methodology and with the EPA/96 Low-Flow methodology) 1997/2018;
      Technical management of construction site activities at landfill sites for the installation of instrumentation for monitoring the quality of groundwater (piezometers), surface water and soil with related sampling of groundwater, soil, biogas and leachate (2008 -2010);
      Environmental investigation plans and due diligence for fuel sales outlets (Verona and province in the years 2013-2014).
      Taking soil samples to be analyzed for the determination of polluted substances;
      Sampling of biogas in a borehole and/or with a capture chamber.
      Soil gas withdrawal;
      Drafting of Environmental Impact Studies (EIA and EIA) for projects related to the research of geothermal resources on the national territory.
      Characterization of contaminated sites and health risk analysis
      (DM 471/99, D.Lgs. 152/06; D.Lgs 04/08)
      • Remediation and safety plan of a chemical company located in the Municipality of Fontevivo (Pr) 2005/2008.
      • Property area located in the municipality of Altare (SV) 2006;
      • Property area located in the Municipality of Parma (Pr) 2010;
      • Characterization of the area of a former landfill located in the Municipality of Solignano (Pr) 2008 and 2011;
      • Characterizations carried out on behalf of private individuals 2005/2023;
      • Characterization of the condominium area for the purpose of replacing underground cisterns (2012-2023);
      • Design of the Remediation Plan and health risk analysis at the fuel point of sale in the Municipality of Solignano (Pr) 2012;
      • Characterization of the area located in the Municipality of Fornovo (2013-2016);
      • Characterization of the former scrapping area located in the Municipality of Guardamiglio (Lo) 2018;
      • Management of site activities for the removal of a tank located in the city of Piacenza (Pc) and practices for waste management (FIR management and relations with ARPAE) - 2018.
      • Management of disposal activities for tanks containing hydrocarbons for private individuals.

      Direct assignments requested by private individuals carried out from 1995 to 2023:
      • Consultant on behalf of CTU for the Court of Parma and CTP and for Individuals;
      • Reports for requests for the inclusion of areas in the Municipal Mining Plans
      (P.A.E.);
      • Geological reports concerning requests for inclusion in the general or partial variants of the Municipal General Regulatory Plans (P.R.G.);
      • Reports for the exploration of groundwater for the purpose of drilling wells for irrigation, industrial and domestic use;
      • Geological and geotechnical reports for the determination of the bearing capacity and subsidence of the soils to assess the suitability of building land (pursuant to Ministerial Decree 14/01/2008 and then Ministerial Decree 17/01/2018);
      • Geological and geotechnical reports in support of existing civil constructions affected by differential or partial subsidence phenomena, for the evaluation of the consolidation interventions of the seabed structures;
      • Geological and geotechnical investigations aimed at identifying the geomechanical parameters of soils, through the execution of static and dynamic penetrometric tests. Interpretation of the results;
      • Preparation of stratigraphies from continuous core drilling;
      • Environmental appraisals;
      • Reports for suitability of Imhoff pits;
      • Suitability reports for slurry storage ponds;
      • As part of the project "the geologist goes to school" sponsored (for the year 2015) by the Order of Geologists of Emilia Romagna (OGER) starting from the AS 2015-2016 I performed lectures to the students of the primary and secondary schools of the Comprehensive Institute of Noceto (Pr) and at the primary school "Padre Lino Maupas" of Vicofertile (Municipality of Parma) on issues related to geological aspects, geomorphological and hydrogeological.
      • Starting from the 2016-2017 academic year, I repeated the project "the geologist goes to school" by giving lectures to the students of the aforementioned schools, to which a frontal lesson was added (for each type of class) concerning the technical aspects "on what to do in case of" earthquake, flood and hydrogeological instability in the daily extracurricular context. To these were added lectures to the population on the same topics. Since December 2018, the project has also been extended to the Museum of Natural Sciences in Piacenza.
      • In the 2018-19 school year, the "Verdi" comprehensive school in Corcagnano (Pr) is also included in the cycle of lessons.


      CONSULTANCY at the former SO. RE. GE. and S.I.G.

      Consultant for SORIGE (for the geotechnical and geognostic sector). and S.I.G. (for the environmental sector) from 2001 to 2004 and in 2009/2010 at the following sites:
       Technical management of the construction site of "Geognostic investigations related to the project of hydraulic arrangement of the Sesia River in the municipalities of Vercelli and Buronzo" (May-July 2001).
       Technical management of the geognostic investigation site "AC Mi-Ge Line" third pass (October 2001 – March 2002).
       Technical direction of the geognostic investigation site "Pontremolese Doubling in variant section S. Stefano Magra – Aulla – Chiesaccia" (April – July 2002).
       Technical direction of the "Campo dreni – Laurinziano Unstable Area" construction site located along the A.V. line Milan-Naples Bologna-Florence route" (October – November 2002).
       Technical direction of geognostic investigations "AC Mi-Ge Line" Terzo valico dei Giovi (March 2004 – May 2004).
       Technical direction of geognostic investigations "Turin-Milan Line" Loc. Settimo Torinese – To (May – June 2004).
       Technical management of the construction site of "Environmental geognostic investigations related to the Characterization Plans of the debris deposits located along the "A.V. Milan-Naples Bologna-Florence route" (September 2002 – September 2004);
       Technical supervision of the "Geognostic Investigations" for the construction of the "North Bridge" in Parma (October – December 2009-February 2010).
      The activity carried out concerned the correct management and execution of site operations in compliance with the technical specifications provided by the Client with regard to the execution of environmental and geotechnical surveys, the creation of stratigraphies, tests on extracted materials (e.g. geomechanics), the installation of instrumentation (e.g. piezometers/inclinometers/settling meters) and the execution of borehole tests (e.g. permeability tests/ hydraulic invoicing, etc.).

      CIVIL PROTECTION
      Drafting of the Emergency Plan of the Municipality of Noceto (Pr) 2018 and subsequent update in the year 2020 and 2024.


      COLLABORATIONS WITH OTHER GEOLOGISTS AND/OR COMPANIES

      MINING ACTIVITIES
      • Mining Plans (PAE)
      Design and execution as designer/collaborator of the following plans:
      • Plan of Mining Activities Municipality of Noceto (Parma) 1995;
      • Plan of Mining Activities Municipality of Bardi (Parma) 1995;
      • Plan of Mining Activities Municipality of Langhirano (Parma) 1996; Plan of Mining Activities Municipality of Torrile (Parma) 1997;
      • Plan of Mining Activities Municipality of Tizzano Val Parma (Parma) 2000.
      • Detailed and Cultivation Plans
      Design and execution as designer/collaborator of the following plans:
      • Detailed Plan of the Municipality of Albareto (Parma) 1995;
      • Detailed Plan of the Municipality of Bardi (Parma) 1995;
      • Detailed Plan of the Municipality of Noceto (Parma) 1996;
      • Detailed Plan P.P. 1 Municipality of Trecasali (Parma) 1997/98; Detailed Plan for the Municipality of Torrile (Parma) 1998/99;
      • Detailed Plan Municipality of Trecasali (Parma) 2000/2001
      HYDROGEOLOGICAL SECTOR
      • Inclinometric measurements for the monitoring of landslides (execution and interpretation of results);
      • Hydrogeological study in the municipal area of Felino (Parma) aimed at researching water resources;
      • Research and development of practical wells for irrigation and domestic use.

      URBAN PLANNING
      o Geological study relating to the General Regulatory Plan of the Municipality of Tornolo (Parma) Variant 1995/96
      o Geological study relating to the General Regulatory Plan of the Municipality of Tizzano Val Parma (Parma) Variant 1997
      o Geological study relating to the General Regulatory Plan of the Municipality of Sissa (Parma) Variant 1998
      o Geological study relating to the General Regulatory Plan of the Municipality of Fontevivo (Parma) Variant 1998
      o Geological study relating to the General Regulatory Plan of the Municipality of Solignano (Parma) Variant 1998/99;
      o Geological component of the General Urban Plan of the Municipality of Bettola (Pc) – 2023)




      SUPPLIED INSTRUMENTATION
       Purge and sampling equipment in piezometers from 2 inches in diameter:
       Pumps for purging and sampling according to the traditional method with a head up to 20 meters from the ground level for sampling in dynamic mode both of the traditional type and of the "Low Flow" type;
       Stainless steel pump (decontaminable) for the dynamic collection of samples with "Low-Flow" methodology (Epa/96) with head up to 24 meters from ground level;
       Pump for soil gas sampling;
       Flow cell for continuous parameter measurement;
       Multi-parameter probes with the possibility of measuring PH, Electrical Conductivity, Redox Potential, Temperature; Dissolved oxygen and percentage;
       Single-valve transparent PVC disposable bailer for static mode sampling;
       Bailer "Bomb Sampler", equipped with an opening and release mechanism that ensures the collection of the sample at the desired height, which can be decontaminated;
       Phreatimeter (50 m) and phreatimeter 100 m;
       Photoionizers (PIDs) for in situ VOC measurement;
       Water-oil interface 50 mt;
       Battery of strain gauges with continuous measurements for the verification of structural instability in buildings;
       Instrumentation for on-site geomechanics: Pocket Penetrometer and Vane Test;
       Specific software related to geology and geomechanics and the creation of stratigraphies;
       Off-road vehicle.
      We hereby give my consent to the processing of personal data pursuant to Legislative Decree 196/03

Language Read Level Written Level Spoken Level
English Medium Medium Medium

Contact Information

Viale Vittoria, 11, 43125 Parma PR, Italia, Parma View on map

+393356354760

+393356354760

...
...
...

Group Type Members

Name
Publications
Poll

No Polls

No Polls

Files

Title Actions


Related Links

No Related Links