Kept up-to-date on the changing geotechnical engineering and hydrogeological advances, shared benefits of new technologies with colleagues, designed and provided support for the implementation of proactive resolution of issues which increase the productivity of the firm by 91% and reduce drastically time wasting and laborious actions by 85%. Resolved maintenance problems to the lowest acceptable level and recommended measures to improve conditions and operations of machines and equipment. Cooperated with Health and Safety department, by thoroughly conducting Hazard and Effect Management Process (HEMP) across project sites, to identify, assess, control and limit the number and severity of the consequences of risks to activities and operation.