Roles and responsibilities:
Consulting solutions for geotechnical design including: Geotechnical investigation requirement, Survey excecution plan, Foundation design solutions, Construction measures for driven pile/pressing pile, Methods for testing pile follow to ASTM, Eurocode, JIS, JRA, TCVN,…
Controlling, approval geotechnical dessign document (pile & soil bearing capacity, foundation settlement,…), geotechnical investigation reports, piles under static axial compressive load reports from contractor and sub-contractor;
To collect, to analysis geotechnical data and soil bearing, pile bearing capacity, settlement calculation for construction design;
Leader of geotechnical team/ Project manager for geotechnical survey;
To control design from designer for foundation of structure, equipment, piling foundation location plan,…to make execution plan for soft soil stabilization;
Consulting and raising solutions for pile foundation and inspection measures for pile bearing capacity as: PC pile, PHC pile, PHC with cement milk, steel pipe pile, steel pipe sheet pile (SPSP), RC pile, bored cast-in-place pile,… and piles under static axial compressive load, PDA test, PIT test, Statnamic Load test;
Processing all others proplem about geotechnical design works in CIMAS.
Main projects:
Thai Binh Cooling Water System Project (2015);
YNP Ti-Sponge Project in Yanbu, Kingdom of Saudi Arabia (Oversea Project – 2015)
Formosa (Dong Nai) Tyre Cord Plant (2) DIP#2 Project (2014);
Package 1 (RFCC, LTU, PRU) at Refinery and Petrochemical Integrated Development Complex in PENGERANG, JOHOR, MALAYSIA (Oversea Project – 2014);
SAMAC, MMA-PMMA Project in Jubail Industrial City, Kingdom of Saudi Arabia (Oversea Project – 2014);
Formosa (Dong Nai) Tyre Cord Plant (2) Fumung Project (2014);
PU Synthetic Leather Plant Project (2013);
Urenco Project for an Industrial Waste Power Generation System Project (2013);
TAMC Talin C5 3MT Plant Project (Oversea project – 2013).