Smart Motorways Programme – SMP 2 – Motorway M1: Junctions 13 – 16, Milton Keynes, June 2016 - present
Geotechnical Engineer responsible for desk study, preliminary design, ground investigation schedules and detailed design for gantries foundations. Member of Collaborative Delivery Framework, which Amey Arup Joint Venture delivers engineering services to enhance the capacity, reliability and journey time for Highways England customers, 36 km long scheme. Client: Highways England.
SP-348 Bandeirantes Highway Widening, Sao Paulo, Brazil, November, 2015 – May, 2016
Lead Geotechnical Engineer, responsible for site investigation schedules, support for earthwork and pavement design, as well as, retaining walls design. Detailed design for the SP-348 highway expansion. Cassio delivered technical reports and bill of quantities in addition to drawings verification, 10km long scheme. Client: CCR-Engelog-Autoban.
SP-258 Highway Widening, Sao Paulo, Brazil, April, 2015 – January, 2016
Lead Geotechnical Engineer responsible for attending technical meetings in order to discuss geotechnical solutions for ground improvement. Detailed design for the SP-258 highway expansion, 12 km long scheme. Support for geotechnical studies including ground investigation, earthworks and pavement. Client: CCR-Engelog-SP Vias.
BR 376/PR Highway Widening, Parana, Brazil, May, 2015 – May, 2016
Lead Geotechnical Engineer, responsible for ground investigation schedules, providing support for earthwork and pavement design, as well as, liable for retaining walls design, slope stability assessment and ground improvement design. Detailed design for the BR-376 highway expansion, 11 km long scheme. His role involved attending technical meetings, walkovers and liaising with other disciplines and sub-contractors. Client: CCR-Engelog-Rodonorte.
BR 277/PR Highway Widening, Parana, Brazil, May, 2015 – May, 2016
Lead Geotechnical Engineer, responsible for ground investigation schedules, providing support for earthwork and pavement design, as well as, liable for retaining walls design and slope stability assessment. Detailed design for the BR-277 highway expansion, 5 km long scheme. His role involved attending technical meetings, walkovers and liaising with other disciplines and sub-contractors. Client: with Ecorodovias – Ecocataratas.
Due Diligence – Google Monet, Sao Paulo, Brazil, August, 2015 – October, 2015
Geotechnical Engineer responsible for undertaking technical report related to the feasibility study based on ground investigations and desk study. Geotechnical analysis for construction of a Data Center in Praia Grande, SP. Client: Turner & Townsend.
Marina City - Urban Development in Santa Catarina, Brazil, August, 2015 – December, 2015
Geotechnical Engineer responsible for studies based on ground investigation, involving in-situ and laboratory tests. His role was related to delivering feasibility study report, involving ground improvement techniques, walkovers and attending technical meetings. As a result it was provided guidance for further detailed studies to support a Masterplan Development for a future expansion area. Client: Achilles+partners.
Monsanto Training Center, Minas Gerais, Brazil, September, 2015 – November, 2015
Geotechnical engineer, liaised with structures team, providing support to deliver the detailed design for the substructures. Design of deep foundations for the Monsanto Headquarter in Brazil. Client: Monsanto.
Shopping Metropolitano, Rio de Janeiro, Brazil, October, 2015 – December, 2015
Geotechnical Engineer responsible for technical analysis and amendments on the previous calculations and issued technical reports, in order to check the foundation design in accordance with Brazilian Standards. Geotechnical evaluation of the foundation design of two water reservoir tanks, already built inside Shopping Metropolitano. Client: Cyrela Commercial Properties.