Cassio_Silva

Mr. Cassio Silva

Connections 32

Professional Information

Senior Geotechnical Engineer - Systra

  • Civil Engineer Geotechnical Engineer

Consulting

  • Deep Excavations Shallow Foundations Shaft Foundations Geosynthetics for Flow Landslides Retaining Walls Slope Stability Analysis
    Pile Foundations

  • MSc or Equivalent
    • Geotechnical Engineer - Universidade de Brasilia : 21/03/2005 - 13/04/2007
  • BSc or Equivalent
    • Civil Engineer - Universidade Federal do Rio Grande do Norte : 02/02/2000 - 16/03/2005

  • Systra : ( 19/02/2024 - Present )
    • Senior Geotechnical Engineer
  • Hydrock : ( 04/01/2021 - 16/02/2024 )
    • Senior Geotechnical Engineer

    • Responsible for delivering geotechnical design for infrastructure projects in the United Kingdom, focused on site development.
  • Arup : ( 29/04/2015 - 24/12/2020 )
    • Senior Geotechnical Engineer

    • Smart Motorways Programme – SMP 2 – Motorway M1: Junctions 13 – 16, Milton Keynes, June 2016 - present
      Geotechnical Engineer responsible for desk study, preliminary design, ground investigation schedules and detailed design for gantries foundations. Member of Collaborative Delivery Framework, which Amey Arup Joint Venture delivers engineering services to enhance the capacity, reliability and journey time for Highways England customers, 36 km long scheme. Client: Highways England.

      SP-348 Bandeirantes Highway Widening, Sao Paulo, Brazil, November, 2015 – May, 2016
      Lead Geotechnical Engineer, responsible for site investigation schedules, support for earthwork and pavement design, as well as, retaining walls design. Detailed design for the SP-348 highway expansion. Cassio delivered technical reports and bill of quantities in addition to drawings verification, 10km long scheme. Client: CCR-Engelog-Autoban.

      SP-258 Highway Widening, Sao Paulo, Brazil, April, 2015 – January, 2016
      Lead Geotechnical Engineer responsible for attending technical meetings in order to discuss geotechnical solutions for ground improvement. Detailed design for the SP-258 highway expansion, 12 km long scheme. Support for geotechnical studies including ground investigation, earthworks and pavement. Client: CCR-Engelog-SP Vias.

      BR 376/PR Highway Widening, Parana, Brazil, May, 2015 – May, 2016
      Lead Geotechnical Engineer, responsible for ground investigation schedules, providing support for earthwork and pavement design, as well as, liable for retaining walls design, slope stability assessment and ground improvement design. Detailed design for the BR-376 highway expansion, 11 km long scheme. His role involved attending technical meetings, walkovers and liaising with other disciplines and sub-contractors. Client: CCR-Engelog-Rodonorte.

      BR 277/PR Highway Widening, Parana, Brazil, May, 2015 – May, 2016
      Lead Geotechnical Engineer, responsible for ground investigation schedules, providing support for earthwork and pavement design, as well as, liable for retaining walls design and slope stability assessment. Detailed design for the BR-277 highway expansion, 5 km long scheme. His role involved attending technical meetings, walkovers and liaising with other disciplines and sub-contractors. Client: with Ecorodovias – Ecocataratas.

      Due Diligence – Google Monet, Sao Paulo, Brazil, August, 2015 – October, 2015
      Geotechnical Engineer responsible for undertaking technical report related to the feasibility study based on ground investigations and desk study. Geotechnical analysis for construction of a Data Center in Praia Grande, SP. Client: Turner & Townsend.

      Marina City - Urban Development in Santa Catarina, Brazil, August, 2015 – December, 2015
      Geotechnical Engineer responsible for studies based on ground investigation, involving in-situ and laboratory tests. His role was related to delivering feasibility study report, involving ground improvement techniques, walkovers and attending technical meetings. As a result it was provided guidance for further detailed studies to support a Masterplan Development for a future expansion area. Client: Achilles+partners.

      Monsanto Training Center, Minas Gerais, Brazil, September, 2015 – November, 2015
      Geotechnical engineer, liaised with structures team, providing support to deliver the detailed design for the substructures. Design of deep foundations for the Monsanto Headquarter in Brazil. Client: Monsanto.

      Shopping Metropolitano, Rio de Janeiro, Brazil, October, 2015 – December, 2015
      Geotechnical Engineer responsible for technical analysis and amendments on the previous calculations and issued technical reports, in order to check the foundation design in accordance with Brazilian Standards. Geotechnical evaluation of the foundation design of two water reservoir tanks, already built inside Shopping Metropolitano. Client: Cyrela Commercial Properties.
  • Engevix Engenharia : ( 14/02/2012 - 24/04/2015 )
    • Geotechnical Engineer

    • Sao Paulo Metro – Line 17 (Gold), Sao Paulo, Brazil, November, 2014 – April, 2015
      Geotechnical Engineer responsible for detailed design of deep foundations and retaining walls of Vereador Jose Diniz Station and Brooklin Paulista Station. Client: Metro SP.

      Brasilia Metro Expansion, Distrito Federal, Brazil, July, 2014 – February, 2015
      Geotechnical Engineer responsible for the pricing process, related to retaining walls and schedules of in-situ and soil laboratory testing, of Ceilandia and Samambaia Stations. Client: Metro DF.

      Bus Rapid Transit South (B.R.T.) – The 23 de Maio Corridor, Sao Paulo, Brazil, May, 2014 – April, 2015
      Geotechnical Engineer responsible for the design of retaining walls of Santana Terminal, cut-and-cover tunnels and ground improvement project of Jardim Aeroporto and Jardim Miriam terminals. Client: SP Trans.

      Train Line 13 (Jade) Expansion, Sao Paulo, Brazil, August, 2013 – January, 2014
      Geotechnical Engineer responsible for deep foundation design of viaducts and support for ground investigation, 10km long scheme. Client: CPTM.

      SP-270 Raposo Tavares Highway Widening, Sao Paulo, Brazil, March, 2013 – April, 2015
      Geotechnical Engineer responsible for detailed design of earthworks, pavement, slope stability assessment, erosion treatment, ground investigation monitoring and retaining walls sizing, 120 km long scheme. Client: DER/SP.

      SP-055 Manoel Hyppolito Rego Highway Improvement, Sao Paulo, Brazil, June, 2013 – March, 2015
      Geotechnical Engineer responsible for the detailed design of deep foundations for ten bridges between Caraguatatuba/SP and Bertioga/SP. Client: DER/SP.

      The Mario Covas Ring Road – North, Sao Paulo, Brazil, April, 2013 – January, 2014
      Geotechnical Engineer responsible for detailed design of deep foundation of the viaducts and retaining walls, slope stability assessments, fieldwork support and technical meetings. Client: DERSA.

      The Second Bridge above Guaiba River, Rio Grande do Sul, Brazil, December, 2012 – June, 2013
      Geotechnical Engineer responsible for providing support for technical and management activities at site, such as topography, ground investigation on-shore and off-shore and preparation of documents for environmental licensing through local authorities. In addition to this, Cassio was responsible for checking the design for the foundation, retaining walls and ground improvement, 7 km long elevated structure. Client: DNIT.

      SP-099 Tamoios Highway Widening, Sao Paulo, Brazil, February, 2012 – December, 2012
      Geotechnical Engineer responsible for slope stability assessment, bridges foundations and retaining walls design and fieldwork support, including ground investigation, construction supervision and attending technical meetings, 25 km long scheme. Client: DERSA.

      Jeep Manufacturer Plant, Pernambuco, Brazil, September, 2014 – January, 2015
      Geotechnical Engineer responsible for the conceptual design of erosion treatment for the earthwork and drainage canals. His role was related to site walkover, support for ground investigation, report preparation and technical meetings. Client: Fiat Chrysler - FCA Group.
  • Urbaniza Engenharia Consultiva : ( 09/02/2009 - 03/03/2012 )
    • Geotechnical Engineer

    • Railway between Mairinque/SP and Corumba/MS, Brazil, April, 2011 – November, 2011
      Lead Geotechnical Engineer responsible feasibility studies for the improvement and expansion of the railway extended over 1600km, for goods transportation. Responsible for site surveying management, ground investigation schedules, walkovers, technical reports and bill of quantities. Client: ALL Logistica.

      BR-376/PR Highway Maintenance, Parana, Brazil, March, 2009 – December, 2009
      Lead Geotechnical Engineer responsible for the detailed design for the remediation scheme related to slope failures, between Curitiba/PR and Joinville/SC. Responsible for slope stability assessment, including water lowering monitoring and retaining structures design. In addition to this, it was provided technical support for the contractors at the construction stage. Client: OHL – Autopista Litoral Sul.

      Chuvisco Park, Sao Paulo, Brazil, November, 2011 – January, 2012
      Geotechnical Engineer responsible for retaining walls design of the landscaping and leisure equipment in the park. Client: Patricia Akinaga.

      Affordable Housing – New Developments, Sao Paulo, Brazil, October, 2009 – March, 2011
      Geotechnical Engineer responsible for technical reports related to earthwork, deep foundation, retaining walls and soil contamination analysis, for the following developments: Brasilandia, Bela Vista E and G, Jabaquara E and F, Jaraqua Q, Santa Cecilia D and Se A. Client: CDHU.
  • Solosconsult Engenharia : ( 09/04/2007 - 06/02/2009 )
    • Geotechnical Engineer

    • Railway between Acailandia/MA and Sao Luis/MA, Brazil, September, 2007 – August, 2008
      Geotechnical Engineer responsible for technical reports, drawings and bill of quantities, related to earthworks, retaining walls and remediation scheme related to slope failures. This railway is used for the transportation of ore, 600 km long scheme. Client: Vale.

      Andrade Iron Ore Mine, Minas Gerais, Brazil, June, 2007 – December, 2007
      Assistant Geotechnical Engineer responsible for detailed design for dams within Andrade Mine, including technical analysis, instrumentation, ground investigation, providing support for technical reports. Client: Vale.

      Agua Limpa Ore Mine, Minas Gerais, Brazil, May, 2007 – October, 2007
      Assistant Geotechnical Engineer responsible for technical reports and drawings related to slope stability assessment, instrumentation, construction method and drainage. Client: Vale.
  • Escol Construcoes : ( 10/03/2003 - 15/03/2004 )
    • Civil Engineer Apprentice

    • Solar das Nacoes Apartments, Rio Grande do Norte, Brazil, March, 2004 – November, 2004
      Apprentice of Civil Engineer responsible for provinding support on the implementation of The Brazilian Programme of Quality and Productivity for Housing, along diffrent stages of construction: from measurements, foundations, superstructure, facilities and fixtures, until realising to the customer. The development is composed by 150 apartments.

Language Read Level Written Level Spoken Level
English High High High
Portuguese High High High
Spanish Medium Medium Medium

Contact Information

Birmingham UK View on map

1215747592

7393371145

...
...
...

Group Type Members

Name
Publications
Poll

No Polls

No Polls

Files

Title Actions


Related Links

No Related Links