Ermanno_Nesci

Mr. Ermanno Nesci

Connections 2

Professional Information

Pavement and Materials Engineer - N/A

  • Engineering Geologist Geological Engineer Geologist

Consulting

  • Data Management Deep Foundations Pile Foundations Laboratory Testing Pavement Road Embankments Concrete / Rollercrete Dams
    Tunneling in Rock

  • MSc or Equivalent
    • Applied Geology - University of Urbino : 01/09/1981 - 13/11/1986

  • N/A : ( 01/01/2026 - Present )
    • Pavement and Materials Engineer

    • Looking for a New Assignment as Pavement and Materials Engineer
  • Turba Solutions : ( 01/02/2025 - 01/12/2025 )
    • Lead Engineer

    • Name of assignment or project: Pre-Tender Documentation, Design Review, and Intended Construction Supervision for
      the Belcan Bridge Replacement Project. Project Status: Bids submitted; tender opening postponed to a date yet to be
      defined.
      Location: Belize
      Client: The Ministry of Economic Development GOB
      Main project features: Three-span concrete bridge, driven piles, retaining walls, abutments and DBST.
      Positions held: Lead Engineer
      Activities performed: Responsible for preparing, organizing, and managing all project documentation required for the pretender phase, ensuring that every technical submission was fully aligned with project specifications, drawings, contractual
      obligations, and applicable regulatory requirements. Activities included the detailed review of drawings, technical
      specifications, environmental documents, and preliminary method statements. Worked closely with the designer and the
      Employer to verify that preliminary engineering solutions met the performance criteria established for the new bridge,
      covering geotechnical, structural, and hydraulic aspects. This included evaluating alternative design proposals, identifying
      inconsistencies, and issuing formal technical comments to guide revisions and ensure design completeness before
      tendering. Supported procurement-related tasks by checking the completeness and compliance of tender documentation,
      Bills of Quantities, financial breakdowns, and the proposed material sources. Ensured traceability and accuracy of all
      technical submissions through a structured document-control system and by coordinating clarification processes among
      stakeholders. Additionally, contributed to early risk identification by highlighting potential gaps in design assumptions,
      material availability, logistics, and environmental constraints. Facilitated regular coordination meetings, prepared progress
      updates, and assisted the Employer in decision-making by providing clear technical summaries and recommendations prior
      to finalizing the tender package.

Language Read Level Written Level Spoken Level
Italian High High High
English High High High
Spanish High High High

Contact Information

Italy View on map

+393297124393

...
...
...

Group Type Members

Name
Publications
Poll

No Polls

No Polls

Files

Title Actions


Related Links

No Related Links