Hossein was responsible for testing and analysis of the piles for all Wagstaff Piling projects in Victoria. He was the only Piletest engineer in Victoria office within 15 months he worked for Wagstaff and successfully conducted, analysed and reported more than 230 pile dynamic load tests as well as 120 pile integrity tests in more than 20 high profile projects.