Jimmy_Marbun

Mr. Jimmy Marbun

Connection 1
Publications 1

Professional Information

Project Manager - Bagas Bumi Persada

  • Geotechnical Engineer Engineering Geologist Geologist Other

Other

  • Earth / Rockfill Dams Retaining Walls Engineering Geology Erosion Pile Foundations Landfill Engineering Geosynthetics for Containment
    Geosynthetics for Flow Groundwater Pumping Seepage Laboratory Testing Landslides Mining Constitutive Modeling / Soil Behavior Finite Element / Finite Difference Risk & Reliability Rock Mass Characterization Standard Penetration Testing (SPT) Borehole Logging Slope Stabilization Slope Stability Analysis Soil Dynamics Testing in the Laboratory Structural Geology

  • MSc or Equivalent
    • Master Degree in Apllied Economics - Universitas Katolik Indonesia Atma Jaya : 16/09/2020 - 30/01/2024
  • BSc or Equivalent
    • Geology - Institut Teknologi Medan : 15/09/1999 - 30/01/2006

  • Fundamentals of Open Pit Slope Design Geotechnical Centre of Excellence - The University of Arizona, 2025
  • Water in Mine Operations and Slope Stability Geotechnical Centre of Excellence - The University of Arizona, 2025
  • Slope Performance Monitoring Geotechnical Centre of Excellence - The University of Arizona, 2024
  • Structural Geology for Geotechnical Professionals Geotechnical Centre of Excellence - The University of Arizona, 2024

  • Bagas Bumi Persada : ( 15/12/2025 - Present )
    • Project Manager

    • Manage a new project of gold mine site
      Monitoring progressing of project
      Project Risk Management
      Project Planning
      Estimating cost of project
  • Bagas Bumi Persada : ( 14/03/2024 - 20/11/2024 )
    • Mine Engineer

    • Monitoring slope stability.
      Manage of water management in pit area.
      Analyze of productivity of coal and overburden
      Manage of Fleet management
      Controlling Pit and Dump area progress
      Manage some projects, such built bridge, cut and fill of road, built processing plan, etc.
  • Asmin Koalindo Tuhup : ( 14/03/2012 - 22/04/2014 )
    • Mine Geologist

    • Interpreted the structural of geology in pit area.
      Reconsiliation of coal’s volume
      Develop geological model based on actual situation.
      &
      As a Quality Control Geologist
      Collecting a sampling of coal in mining area.
      Determine the type of coal, based on the coal quality.
      Control and monitor of coal handling process at mine area, ROM stock pile, crusher plant, and
      port.
  • Harita Persada Jaya Tambang : ( 15/09/2010 - 15/11/2011 )
    • QC Geologist

    • Quality Control Geologist in Iron Ore Open Pit Mining Company
      Manage some assistant’s geologists in collecting iron ore samples.
      Classified types of iron ore.
      Colaborated with Mine Operation and Processing Plant for iron ore handling.
      Calculated the specific gravity of iron ore.
      Calculated the volume of iron ore in mining area, ROM stockpile, and Stockpile in Sea Port.
      Controlling of coal handling process in stock pile ROM, crushing processing, and sea port.

Language Read Level Written Level Spoken Level
Malay/indonesian High High High
English Medium Medium Medium

  • Determination Analysis Of World Coal Price Fluctuations Using The Vector Error Correction Model (VECM) Method
    Journal Article published 2025 Apr 29 in Eduvest - Journal of Universal Studies volume 5 issue 4 on pages 3876 to 3893
    Authors: Jimmy Marbun
    https://doi.org/10.59188/eduvest.v5i4.44777


Contact Information

Indonesia View on map

...
...
...

Group Type Members

Name
Publications
Determination Analysis Of World Coal Price Fluctuations Using The Vector Error Correction Model (VECM) Method
Journal Article published 2025 Apr 29 in Eduvest - Journal of Universal Studies volume 5 issue 4 on pages 3876 to 3893
Authors: Jimmy Marbun
https://doi.org/10.59188/eduvest.v5i4.44777
Poll

No Polls

No Polls

Files

Title Actions


Related Links

No Related Links