Supervised geotechnical in situ investigations in a High-Speed Railways Project - Ligne double voie eletrifiée (132 km) Oued Tlelat-Tlemcen, Algeria. Interpretation of geotechnical reports and project optimizations for the construction of viaducts foundations, support structures and slope stabilizations using a numerical modelling - review and approval of geotechnical desk design. Survey the job site to prevent geo-hazards. Geostructural analysis of the full-face excavation of a tunnel using hydraulic breaker and explosive for preliminary support. Supervision of data collection from tunnel instrumentation and monitoring (bore hole extensometer, strain gage, radial and tangential load cells and convergence measurement. Supervised 3 job site laboratories. Manage, update and maintain all requirements, procedures and controls by ISO 9001 – Gestion and control of: Non-Conformities, work procedures, EMM control, etc.
After 2018, I’m also a Project Manager for Embankments. My duties are: Planning and budget control; Review and approval of embankments, hydraulic and drainage design; Coordination and supervision of job site work.