Project: Construction of Container Berths and Stacking Yard on Jurong Island, Singapore”. This project was one of project finished in one year with value of 21.25 Million USD and it was mainly contained Pile foundation and Warf Deck structures with precast, prestressed beams and reinforced concrete slabs.Project: "Reclamation of Pulau Ubin and Pulau Tekong (Part 1)”, which was offshore land reclamation for the extension of Pulau Tekong Island covering 14km long perimeter bund. The estimated cost of the project was S$1.7 Billion. The Housing and Development Board of Singapore was the client and Surbana International Consultants Pte Ltd provided the consultancy services in collaboration with National University of Singapore, an authorized independent consultant with limited capacity. Toa Corporation was undertaken the contract for the project as main contractor with Jan De Nul Construction Company of Belgium. The perimeter bund was basically consisted of both Stabilized Dredged Fill (SDF) and sand. The part of the Bund with SDF material was completed in 2010 September, and it was presently remaining perimeter bund, which was Sand Bund constructed using two major soil improvement methods Sand Piles and Cement Deep Mixing (CDM), and finally protected the bund with Stone Revetment.