Theologos_Lazaridis

Theologos Lazaridis

Connections 10

Professional Information

  • Civil Engineer

<em>None specified</em>

  • Seismic Slope Stability Soil Dynamics In-Situ Tailings Dams

  • PhD or Equivalent
    • - University of Bristol : 01/02/2001 - 01/06/2006

  • ATKINS : ( 01/09/2006 - 01/06/2008 )


    • Gautrain Rapid Rail Link S. Africa – Client Bombela JV

      Responsible for carrying out numerical modelling analyses using 2D Plaxis for deep excavations and lateral support of underground station boxes, cut & cover tunnels and a car-park adjacent to one of the stations. Technical report and presentation of results to Principal Engineer. Internal checking of numerical analyses. Instructions and checking of Construction drawings.

      Bond Street Station Upgrade UK – Client London Underground.

      Settlement assessment for complex geometry tunnelling in centralLondonof tunnel and shafts excavations in soft ground. Numerical analyses and technical report using 2D Plaxis.

      Gerrards Cross tunnel (post-collapse) UK – Client Tesco

      Category 2 check and numerical modelling of the failure and reconstruction of the Gerrards Cross tunnel (three-pin arch) using FLAC. Provide technical report and liaison with client, designer and contractor.

      A14 truck road UK

      Numerical analyses of slope stability using SLOPE/W. Foundation assessments for the proposed widening of the A14 trunk road

Language Read Level Written Level Spoken Level
Greek High High High
English High High High

Contact Information

Xatzistavrou 11, Xanthi 671 00, Greece View on map

...
...
...

Group Type Members

Name
Publications
Poll

No Polls

No Polls

Files

Title Actions


Related Links

No Related Links