Corpoelec is one of the biggest companies of Venezuelan, responsible for the hydropower sector in the Guayana region since it produced about 75% of the electricity consumed in the country.
Corpoelec currently operate 3 Hydroelectric projects which are Simón Bolívar (Guri) with an installed capacity of 10,000 megawatts, Hydroelectric Antonio José de Sucre (Macagua) with an installed capacity of 3,140 megawatts and Hydroelectric Francisco de Miranda (Caruachi) with an installed capacity of 2,280 megawatts. Manuel Piar Hydroelectric (Tocoma) with an installed capacity of 2,160 megawatts actually under construction. Also, is responsible of the network of transmission lines that across the Country reaching a length of 5,700 Km.
Projects Information:
• Macagua Hydroelectric Project (Earth-Rock fill Embankment & RFC Dams- Vol. 2MM m3)
• Caruachi Hydroelectric Project (Earth-Rock fill Embankment Dam- Vol. 8MM m3)
• Tocoma Hydroelectric Project (Earth-Rock fill Embankment Dam- Vol. 8MM m3)
• Guri Hydroelectric Project (Earth-Rock fill Embankment Dam- Vol. 15MM m3)
Head Geotechnical Department & Project Coordinator 2008 - 2011
• Responsible of the department in carrying out the updating and revision of the designs of geotechnical character of the dams, foundations, cofferdams, system and implementation of the Injections, geological evaluation of the slopes of the Tocoma Project (more than 8 million m3 soils and rocks of earth movement)
• Develop terms of reference for the system of tendering the construction project of the 2nd hydroelectric development of the western region of Venezuela, with earthworks of 5.4 million m3 and a storage capacity of 1185 million m3, with a power of 480 MW and investment amount of USD 1 billion.
• Drafting of stabilization 10 batters to the main arterial road Caracas-La Guaira between the capital and main seaport, which involved the movement of 30,000 m3 of land, in a span of 6 months.
• Preparation of the project report in its study phase for the construction of the compensator reservoir hydroelectric project La Vueltosa located in the western region, which generates 720 MW and maintains a storage capacity of 5,600 million m3 of water.
• Coordinator of the geotechnical area in the draft formal inspection of the Central Hydroelectric of Macagua in Guayana City, with a generating capacity of 2,160 MW, through design review, recalculation of the stabilities of the slopes, control network water flow, following the standards of US Bureau of Reclamation and the Polytechnic University of Valencia in Spain.
• Coordination and review of the Guri Hydroelectric Project in Guayana City, Venezuela, with a capacity of 10,000 MW. Assessment of compliance with technical standards and operating calculations following the standards of US Bureau of Reclamation and the Polytechnic University of Valencia in Spain.
Project / Construction engineer & Contract Manager 1996 - 2008
• Preparation of the redesign of the materials used in the cofferdam on the right dam of Tocoma hydroelectric according to the reduced volume of material according to the study of bathymetric survey.
• Study of stability of excavation slopes and fillings of the Dam
• Study and revision of the materials of filters of the body of the earth dam
• Performing Design Field instructions.
• Coordinator of Left Dam soil and rock (8 million m3) Hydropower Project Caruachi, Guayana, Venezuela. Technical supervisor of construction progress, costs and quality assurance of the works.
• Supervision works Foundation, rock grouting, embankment test for clay and filters.
• Investigation and studies for quarries and borrows for rocks material and clay and sand materials
• Installation of instruments of monitoring for leakage, piezometers, relief wells
• Supervision of the excavation and fillings and placement of ballast material for the railway line due to the deviation because of the reservoir formed by the Caruachi dam.
• Supervision of clay materials, rocks and filters and construction of the dams downstream of the dams of the Macagua Project.
• Resolving problems and aspects of design and implementation in the field
• Supervision and monitoring of quality control of materials and their execution in the field.
• Supervision of the works excavations, fillings, asphalt pavements of Highway Sucre Figarella that connect the urban city with Project.