I supervised the construction of bridges, culverts, micro dams, building construction within the vicinity of Ndop plane. For the technical specifications to be respected, control was done in the following ways:
- During earth works, I extracted soil sample using samplers and mechanical auger to the laboratory for verification of bearing capacity at the specified depth;
- Each time I come across soil with low resistance, I improved the soil. The depth of soil improvement was done base on the bulb intensity of stress generated by the footing or foundation designed;
- I supervised the verification of leveling for earth works and setting out with the use of dumping level, water level and spirit level;
- During casting of lean concrete, I ensured that the thickness, dosage of lean concrete on ground level was controlled before the casting of foundation footing;
- During construction of concrete structures beneath the soil or ground level, I verified materials in the following ways: ensuring that form work for the concrete structures at foundation are smooth and hard enough to resist concrete casting, tensile stress for steel verified in the laboratory, concrete crushing for compressive strength done 28 days after each time I collect sample to the laboratory during mixing of concrete;
- Sclerometer was used for already constructed structures to see if it attains the resistance specified in the contract document;
- I controlled the mandrel of steel diameter and anchorage during mounting of steel rebar;
- A similar thing was done for the construction of concrete superstructures (concrete above the soil level;
- I controlled wooden materials base on the availability of knots , direction of grains or fibers, fiber saturation point to control the degree of shrinkage and swelling of wood including for the construction of rafters, purlines, door and window frames, etc;
- For water supply scheme, I checked materials like pressure in pipes for supply and laying of pipes, pipe thickness, pipe line depth and sizes of pipes where controlled. I also controlled different in altitudes.
- I controlled the resistance of stone and concrete catchment, inspection chambers, and stand taps as per specification in contract documents.
For every task of work, after confirmation of qualities, the quantities were also verified in terms of percentage evaluation for payment.