The Jiji and Mulembwe Hydropower Project is a run-of-the-river hydropower project that will provide Burundians with affordable, clean, reliable, and sustainable energy. The project will finance construction of two hydropower stations. Combined capacity will reach 50 MW,On the Jiji River a13.5 meter high concrete dam and On the Mulembwe River, a 14 meter high concrete dam.