Deep excavation
Hi,
i am a bit confused with how to use fixed end enchor in modelling the deep excavation.
1. How do we input the equivalent length for the fixed end anchor? let say the width of excavation is 80m and the depth is 9.0m, internal strutting.
2. How do i interpret the output force? if i input the Lspacing as 1.0m, does the output anchor force is per meter width out of plane direction?
3. anyone else ever did a modelling on 2 level basement before? seriously need some advice.