Published: 15 July 2015
A wind energy development project will be launched in the region of Brittany. It is in the heart of the forest of the town of Forges that will rise and 17 wind turbines.
The Nantes geotechnical service is mandated for an engineering mission involving a program of geotechnical investigations, delivery of construction principles and design of a dimensional sketch by type of geotechnical structure.
This mission will take place in the month of August. The aim, in addition to defining the geological context, is to provide the first elements to determine the design for earthmoving, paving the foundation and slopes.
http://www.groupe-cebtp.com/actualite-2/geotechnique-eolien/
Categories
Green Infrastructure