Kawasaki Geological Engineering Co.,Ltd.
Kenji Nakayama
Major:Soil Mechanics(Slope Engineering)
Georisk Management Case
At Lakeside road which is newly in service, I found that the embankment measurement with a gentle slope is constructed under the cut slope. And I also think that after ground investigation and displacement monitoring with a construction, this site is changed the construction method which shows the picture. On the other hand, this judgement is a success of Georisk Management with the Geotechnical Consultant and Workers.