How to deal with cone formation at crown to SPL of a tunnel having depth of about 9-10m during progressive excavation ?? Various measures like rock bolts /SFRC etc are not possible due to machine reach limitation.
How to deal with cone formation at crown to SPL of a tunnel having depth of about 9-10m during progressive excavation ?? Various measures like rock bolts /SFRC etc are not possible due to machine reach limitation.
Cone Formation at Crown to SPL of a Tunnel (9-10m Depth)
When rock bolts or SFRC are not possible due to machine limitations, alternative measures include:
Sequential excavation with shorter advances to minimize ground relaxation.
Forepoling or pipe roofing: To stabilize the crown.
Grouting: Cement or chemical grouting above the crown to strengthen the ground.
Use of a thicker primary lining or ribs with lagging to control deformation.