Published: 3 May 2021
When testing deep foundations with Pile Integrity Testing equipment
What should be the amplification value?
What pile size does this method support correctly?
A new technical note this Engineers page outlines the reasons for attenuation in pulse-echo integrity testing and the matching amplification needed to compensate it.
I have also created an on-line calculators page – so you can calculate wave speed and attenuation quickly (no setup)
Categories
Laboratory Testing, Pile Foundations
Keywords
Construction, Testing, Deep Foundations, Geotechnical analysis
