CARACTERIZACIÓN GEOMECÁNICA Y TRATAMIENTOS EN LAS GALERÍAS DEL BITUNEL TREN INTERURBANO MÉXICO – TOLUCA (TIMT)

Julio Cesar Chable Moreno
Published: 25 January 2025

Description

The construction of the Mexico-Toluca Interurban Train project depends fundamentally on three aspects: the topographic conditions, the hydrological conditions and the geological-geotechnical conditions. This article shows the process and the results of the geomechanical characterization of a selected site for the construction of the 4.7 km bi-tunnel, which is part of said Project. After entering the geological condition of the site, the procedure performed to define the geomechanical properties of heterogeneous materials is stated, evidencing the importance of recognizing and generating a collection of field information on the geotechnical characteristics of rock masses located in the galleries of the bi-tunnel, in which the intact rock is not representative of the mass in its entirety, data that will be of importance in the information generated on the stability and treatments that must be placed for the excavations in the galleries that make up the bi-tunnel

Date Conducted

November 2018

Contributors

Julio Chable Moreno, Jorge López, Ulises Talonia

Categories

Engineering Geology, Tunneling in Rock, Tunneling in Soils

Keywords

Geotechnical analysis, geomechanical, Caracterización

Attachments

Name Type Size Last Modified
CARACTERIZACIÓN GEOMECÁNICA Y TRATAMIENTOS EN LAS GALERÍAS DEL BITUNEL TREN INTERURBANO MÉXICO – TOLUCA (TIMT) Report Presentation 768.08 KB 26 October 2022 Download